The following is historical information about NSTAR's electric system and key milestones.

  • NSTAR's Highest Historical Peak Load: 4,978 megawatts (July 22, 2011)
  • Net Metering Cap: 49.78 megawatts (1 percent of highest historical peak load)

Net Metering Totals (As of January 6, 2012)

  • Projects Online: 33.15 megawatts
  • Projects with Applications Submitted: 151.18 megawatts
  • Total (both above): 184.38 megawatts