Other Information
The following is historical information about NSTAR's electric system and key milestones.
- NSTAR's Highest Historical Peak Load: 4,978 megawatts (July 22, 2011)
- Net Metering Cap: 49.78 megawatts (1 percent of highest historical peak load)
Net Metering Totals (As of January 6, 2012)
- Projects Online: 33.15 megawatts
- Projects with Applications Submitted: 151.18 megawatts
- Total (both above): 184.38 megawatts